Everform Packaging — Plant 01 · Thursday 20 August 2026 · Shift 1 in progress

OEE
4.2 pts
82.7%
A 84.4% · P 99.8% · Q 98.1%
Production Attainment
17.2 pts
68.9%
88,386 good of 128,200 scheduled
Operator Efficiency
6.2 pts
95.4%
Target ≥ 94% · controllable time only
Total Downtime
4h 23m
3h 55m unplanned · 9 machines
Loss explanation

Attainment is 68.9% while operator efficiency is 95.4% — the shortfall is driven by machine breakdown and material availability, not operator performance.

Production vs Target

Scheduled target and actual good production, recorded production days
93.3%
attainment
94.6%
attainment
91.9%
attainment
88.4%
attainment
81.3%
attainment
68.9%
attainment

Loss Analysis

Lost production time by category · 4h 23m today
  • MachineBreakdown
    2h 04m47.1%
  • MaterialMaterial Shortage
    40m15.2%
  • ProcessTool Change
    36m13.7%
  • Facility / ExternalCompressed Air Failure
    18m6.8%
  • OperatorOperator-related Delay
    15m5.7%
  • MaintenancePreventive Maintenance
    12m4.6%
  • QualityQuality Inspection
    6m2.3%
Total lost production time4h 23m

Machine Status

9 machines across Extrusion, Thermoforming, Cutting / Trimming and Packing
Machine performance
5
Running
1
Setup
1
Planned Maintenance
1
Breakdown
1
Offline
  • CTR-01Cutting / Trimming
    FT-1000 · Food Tray 1000 ml · Ilva Norberg
    Running
  • EXT-01Extrusion
    FT-2500 · Food Tray 2500 ml · Tomasz Grelik
    Running
  • PKG-01Packing
    PC-0500 · PET Container 500 ml · Rafael Ostenbrink
    Running
  • PKG-02Packing
    PC-0850 · PET Container 850 ml · Bruno Kestermann
    Running
  • THF-01Thermoforming
    FT-2500 · Food Tray 2500 ml · Marisel Duvant
    Running
  • THF-03Thermoforming
    PP-INS-01 · PP Insert Tray · Vera Lisandru
    Setup
  • EXT-02Extrusion
    No active order
    Planned Maintenance
  • THF-02Thermoforming
    PC-0850 · PET Container 850 ml · Serena Vaikule
    Breakdown
  • CTR-02Cutting / Trimming
    No active order
    Offline

Operator Performance

Efficiency target ≥ 94% · measured on controllable production time
All operators
OperatorCurrent MachineShiftGood PiecesEfficiency Status
Serena Vaikule
OP-1005
THF-02Shift 212,405129.4%On Target
Tomasz Grelik
OP-1002
EXT-01Shift 17,74295.9%On Target
Ilva Norberg
OP-1003
CTR-01Shift 119,21894.5%On Target
Marisel Duvant
OP-1001
THF-01Shift 118,04190.0%Below Target
Rafael Ostenbrink
OP-1004
PKG-01Shift 130,98089.5%Below Target

Recent Production Activity

Shop floor events, latest first
  • Material shortage recorded11:42

    CTR-01 · PET roll batch delayed · 26 min lost

  • Machine entered setup11:07

    THF-03 · Changeover to PP-INS-01 · OP-1009

  • Machine breakdown recorded10:38

    THF-02 · Forming station alarm · maintenance notified

  • Production resumed10:12

    PKG-02 · After compressed air recovery · 19 min lost

  • Quality inspection logged09:35

    FT-1000 on CTR-01 · sample pass · 12 min

  • Production run started06:05

    RUN-24816 · THF-02 · PC-0850 · OP-1005

  • Production run completed06:00

    RUN-24812 · PKG-02 · 39,190 good pcs · 93.3% attainment