Plant Dashboard
Everform Packaging — Plant 01 · Thursday 20 August 2026 · Shift 1 in progress
OEE
4.2 pts82.7%
A 84.4% · P 99.8% · Q 98.1%
Production Attainment
17.2 pts68.9%
88,386 good of 128,200 scheduled
Operator Efficiency
6.2 pts95.4%
Target ≥ 94% · controllable time only
Total Downtime
4h 23m
3h 55m unplanned · 9 machines
Loss explanation
Attainment is 68.9% while operator efficiency is 95.4% — the shortfall is driven by machine breakdown and material availability, not operator performance.
Production vs Target
Scheduled target and actual good production, recorded production days
93.3%
attainment
94.6%
attainment
91.9%
attainment
88.4%
attainment
81.3%
attainment
68.9%
attainment
Loss Analysis
Lost production time by category · 4h 23m today
- MachineBreakdown2h 04m47.1%
- MaterialMaterial Shortage40m15.2%
- ProcessTool Change36m13.7%
- Facility / ExternalCompressed Air Failure18m6.8%
- OperatorOperator-related Delay15m5.7%
- MaintenancePreventive Maintenance12m4.6%
- QualityQuality Inspection6m2.3%
Total lost production time4h 23m
Machine Status
9 machines across Extrusion, Thermoforming, Cutting / Trimming and Packing
5
Running
1
Setup
1
Planned Maintenance
1
Breakdown
1
Offline
- RunningCTR-01Cutting / TrimmingFT-1000 · Food Tray 1000 ml · Ilva Norberg
- RunningEXT-01ExtrusionFT-2500 · Food Tray 2500 ml · Tomasz Grelik
- RunningPKG-01PackingPC-0500 · PET Container 500 ml · Rafael Ostenbrink
- RunningPKG-02PackingPC-0850 · PET Container 850 ml · Bruno Kestermann
- RunningTHF-01ThermoformingFT-2500 · Food Tray 2500 ml · Marisel Duvant
- SetupTHF-03ThermoformingPP-INS-01 · PP Insert Tray · Vera Lisandru
- Planned MaintenanceEXT-02ExtrusionNo active order
- BreakdownTHF-02ThermoformingPC-0850 · PET Container 850 ml · Serena Vaikule
- OfflineCTR-02Cutting / TrimmingNo active order
Operator Performance
Efficiency target ≥ 94% · measured on controllable production time
| Operator | Current Machine | Shift | Good Pieces | Efficiency | Status |
|---|---|---|---|---|---|
Serena Vaikule OP-1005 | THF-02 | Shift 2 | 12,405 | 129.4% | On Target |
Tomasz Grelik OP-1002 | EXT-01 | Shift 1 | 7,742 | 95.9% | On Target |
Ilva Norberg OP-1003 | CTR-01 | Shift 1 | 19,218 | 94.5% | On Target |
Marisel Duvant OP-1001 | THF-01 | Shift 1 | 18,041 | 90.0% | Below Target |
Rafael Ostenbrink OP-1004 | PKG-01 | Shift 1 | 30,980 | 89.5% | Below Target |
Recent Production Activity
Shop floor events, latest first
- Material shortage recorded11:42
CTR-01 · PET roll batch delayed · 26 min lost
- Machine entered setup11:07
THF-03 · Changeover to PP-INS-01 · OP-1009
- Machine breakdown recorded10:38
THF-02 · Forming station alarm · maintenance notified
- Production resumed10:12
PKG-02 · After compressed air recovery · 19 min lost
- Quality inspection logged09:35
FT-1000 on CTR-01 · sample pass · 12 min
- Production run started06:05
RUN-24816 · THF-02 · PC-0850 · OP-1005
- Production run completed06:00
RUN-24812 · PKG-02 · 39,190 good pcs · 93.3% attainment