OEE = Availability × Performance × Quality. Every value is derived from the recorded production runs and downtime events for the selected period.

Overall OEE
80.6%
12 runs · 80h 43m scheduled
Availability
86.0%
11h 20m downtime recorded
Performance
95.5%
Actual output vs machine-part standard rate
Quality
98.2%
5,144 rejected of 280,690
Production Attainment
80.1%
275,546 good of 344,200 scheduled

Filters

12 production runs · 2026-08-18 → 2026-08-20 (all recorded runs)

OEE and component trend

Per production day across the runs in the selected period.

OEE by production area

Largest performance gap: Thermoforming at 78.9% OEE.
Extrusion89.9%
Availability
92.1%
Attainment
86.1%
Downtime
1h 06m
Top loss
Maintenance
Thermoforming78.9%
Availability
80.0%
Attainment
74.0%
Downtime
5h 10m
Top loss
Machine
Cutting / Trimming85.7%
Availability
79.9%
Attainment
82.0%
Downtime
2h 43m
Top loss
Process
Packing79.2%
Availability
91.4%
Attainment
82.9%
Downtime
2h 21m
Top loss
Facility / External

OEE by machine

Status thresholds (≥ 75% on target, ≥ 60% below target) are configured for this demonstration plant.
MachineProduction areaAvailabilityPerformanceQualityOEEDowntimeAttainmentStatus
EXT-01
Extrusion Line 1
Extrusion92.1%99.3%98.3%89.9%1h 06m86.1%On Target
EXT-02
Extrusion Line 2
Extrusion0mNo production
THF-01
Thermoforming Line 1
Thermoforming91.6%97.4%98.0%87.4%1h 10m85.3%On Target
THF-02
Thermoforming Line 2
Thermoforming45.8%148.1%95.7%64.9%2h 28m44.3%Below Target
THF-03
Thermoforming Line 3
Thermoforming79.6%94.0%96.9%72.5%1h 32m81.5%Below Target
CTR-01
Cutting / Trimming Line 1
Cutting / Trimming79.9%109.5%98.0%85.7%2h 43m82.0%On Target
CTR-02
Cutting / Trimming Line 2
Cutting / Trimming0mNo production
PKG-01
Packing Line 1
Packing89.7%84.7%99.1%75.2%1h 10m71.1%On Target
PKG-02
Packing Line 2
Packing92.6%89.8%98.6%82.0%1h 11m93.3%On Target

Recorded loss minutes by category

Straight from the Downtime register for the runs in scope — overlapping events merged.
Loss categoryPlannedUnplannedTotalShare
Machine0205205
32%
Process10158159
25%
Facility / External09494
15%
Material06868
11%
Maintenance59059
9%
Operator04040
6%
Quality01818
3%

Loss intelligence

Rule-based observations derived from the production, downtime and maintenance records in the selected period. No prediction, no inference beyond the recorded data.
  • Thermoforming currently has the lowest OEE among production areas, primarily due to machine downtime.

    The gap to the strongest area (Extrusion) is 11.0 OEE points over the selected period.

    Thermoforming OEE: 78.9%Extrusion OEE: 89.9%Machine downtime: 2h 27m
  • CTR-01 has the highest recorded machine downtime in the selected period.

    2h 43m of downtime (25% of all recorded loss minutes) including 1 machine-related unplanned event.

    Downtime: 2h 43mOEE: 85.7%Attainment: 82.0%
  • Machine losses account for the largest share of recorded downtime.

    3h 25m of 10h 43m total recorded loss minutes (32%), of which 3h 25m is unplanned.

    Machine: 3h 25mProcess: 2h 39mFacility / External: 1h 34m
Method

Runs still in progress are measured on elapsed scheduled time up to the demo timestamp, so a partially completed shift is not treated as a loss. Status thresholds are configured plant targets, not universal standards. Current period OEE status: On Target.