Efficiency statusAttention
Good Pieces18,041
Total Pieces − Rejected Pieces
Scheduled Minutes480 min
End Time − Start Time
Controllable Production Time480 min
Scheduled − Planned − non-operator Unplanned − other Non-Operator Loss
Expected Pieces28,800
Controllable Time ÷ 60 × Production Standard
Production Attainment75.2%
Good Pieces ÷ Scheduled Target × 100
Operator Efficiency62.6%
Good Pieces ÷ Expected Pieces × 100 — never capped at 100%
Quality Rate97.9%
Good Pieces ÷ Total Pieces × 100