Add Downtime Event
Attach a loss to an existing production run. Classification decides whether the minutes are excluded from controllable production time.
Production run
Machine, operator, product and shift are derived from the run
Timing
Loss classification
Recalculation preview
Select a production run
Select a production run to see the effect on controllable time and operator efficiency.