MA ManufOS
MA

New Plant Event

Plant level losses default to Facility / External and are never operator controllable. Planned utility shutdowns are booked as planned downtime.

Back to register

Event

Event ID PE-3087 — assigned on save

Scope

Which part of the factory the event affects.
Affected areas
Thermoforming · 3 machine(s) in scope

Description & notes

Cancel

Impact preview

Calculated live, before the event is saved.
Power OutageUnplanned Downtime
Affected machines
3
Affected runs
2
Machine-minutes lost
1h 00m
Downtime records
2 new
Eventmachinesrunsdowntimeefficiency
Machines in scope: THF-01 (Thermoforming), THF-02 (Thermoforming), THF-03 (Thermoforming)

Downtime generated per run

RunMachineMinutesExpected pcsEfficiency
RUN-24817THF-0130m27,240 25,44066.2%70.9%
RUN-24816THF-0230m9,590 8,750129.4%141.8%