New Plant Event
Plant level losses default to Facility / External and are never operator controllable. Planned utility shutdowns are booked as planned downtime.
Event
Event ID PE-3087 — assigned on save
Scope
Which part of the factory the event affects.
Affected areasThermoforming · 3 machine(s) in scope
Description & notes
Impact preview
Calculated live, before the event is saved.
Power OutageUnplanned Downtime
Affected machines
3
Affected runs
2
Machine-minutes lost
1h 00m
Downtime records
2 new
Eventmachinesrunsdowntimeefficiency
Machines in scope: THF-01 (Thermoforming), THF-02 (Thermoforming), THF-03 (Thermoforming)
Downtime generated per run
| Run | Machine | Minutes | Expected pcs | Efficiency |
|---|---|---|---|---|
| RUN-24817 | THF-01 | 30m | 27,240 → 25,440 | 66.2% → 70.9% |
| RUN-24816 | THF-02 | 30m | 9,590 → 8,750 | 129.4% → 141.8% |